Routing I/O Box Cables

To route the I/O Box cables in the NCR SelfServ Checkout unit, follow these steps:

1.Install all R6 Lite components. For more information, refer to Installing R6 Lite Components.

2.Using cable ties, wrap the cables and then tie them on corresponding lance bridges to fix the cables on the Upper Cabinet frame as shown in the image below.

3.Using cable ties, group the cables exiting to the back of the unit and then tie them on the I/O Box mounting plate as shown in the image above.

4.Do any of the following:

Install other R6 Lite components. For more information, refer to Installing R6 Lite Components.

Route and sort cables. For more information, refer to Routing and Sorting Cables.

Note:  For more information about routing cables, refer to the SCO Release 6 Lite Cable Routing Instructions (497-0519586).