Turning On the Hardware System
To turn on the NCR SelfServ™ Checkout (7350) hardware system, follow these steps:
Note: Before connecting the power to the terminal, ensure that all cables are properly connected.
1.Plug the NCR SelfServ™ Checkout (7350) Power Cable into the Power Strip before plugging the Power Strip cable into the dedicated power outlet.
Note: The Power Strip is located inside the bagwell for units with bagging options. For units without bagging options, the Power Strip is located behind the back panel.
2.Unlock and then open the NCR SelfServ™ Checkout (7350) Core Door. For more information, refer to Opening the Core Door.
3.Turn on the Universal Power Supply (UPS) by pressing its power button.
Note: If the unit does not have a UPS, the unit should turn on when the Power Strip is connected to the dedicated power outlet.
4.Turn on the 7702 terminal display to start the NCR SelfServ™ Checkout (7350) software system. For more information, refer to Turning On the NCR 7702 Terminal Display.